Major challenge of the project was to replace chiller plant of existing complex. Question posed was "How are you going to get the chiller out of a 3-foot wide door?" Responded to client by saying, "Anyone can get an old chiller out of a 3-foot wide door. Just cut it up into enough small pieces." The real challenge was installing the new 800-ton chiller.
Implemented a plan to excavate a swimming pool-size hole outside the building and remove a large portion of the existing foundation wall.
All of this work was done in less than eight weeks, which was necessary in order to bring the plant online for the cooling season.